Pavilion Construction
AZ • ID • CA • OR • MT • NV • NM • TX • WA
Home
Our Services
Featured Projects
Open for Bid
About Us
News
Login
Open for Bid
Open for Bid
Christina Court Senior Housing - Carson City, NV
Building 2900 On First - Seatlle, WA
EWU New Residence Hall - Cheney, WA
Stage Coach Apartments - Santa Fe, NM
Paisano Green Development - El Paso, TX
The Paisano Green Development for the Housing Authority of the City of El Paso is 73-unit of senior housing , LEED Platinum, Net zero housing facility when completed.
Bid Documents:
-
Davis Bacon Wage Decision
-
Asbestos Survey 8/05/10
-
Environmental Studay Report 8/05/10
-
Drainage Report 8/05/10
-
Draft of Geotechnical Report 8/05/10
-
HUD Noise Assesment Report
-
Legal Description
Construction Documents:
-
Architectural Drawings
-
Mechanical Drawings
-
Plumbing Drawings
-
Electrical Drawings
-
Structural Drawings
-
Civil Drawings
-
Survey Drawings
-
Lighting Plan
-
Landscape Drawings
-
Project Manual
-
Asbuilt Drawings
Cut Sheets:
-
Apartment Compactor
-
Elevator
-
Interior Appliances and Misc.
-
Fronius IG
-
Interior Lighting
-
LARS Neotherm
-
Lighting Information
-
Pump Mounted Volume Water Heater
-
Shower Pan
-
Siemens sub Meter
-
Siemens
-
Studor Vent
Check Back Regularly for Addendums!
Copyright © 2008 · Pavilion Construction · All Rights Reserved ·
Powered by Enso CMS