Tualatin Marquis Assisted Living project is a 103,463 sqft. wood framed structure consisting of one building with 54 skilled nursing beds and 80 assisted living units. Project is currently Scheduled to start in September 2012.
Bids Due:
Project Documents:
- Pavilion Construction Request for Subcontractor and Supplier Bids
- *Revised Davis Bacon Wage Decision Residential*
- On/Off Site Work, Concrete, Exterior Elevations, Second/Third Floor Construction
- *Revised Davis Bacon Wage Decision Commercial*
- Proposed Limits of Commercial Wage Scale
- Geotechnical Report
Documents: *HUD Drawings*
- Civil Drawings
- On Site Civil Drawings
- Off Site Civil Drawings
- Traffic Signal Drawings
- Landscape Drawings
- Architectural Drawings
- Interior Design Drawings
- Fire Sprinkler Drawings
- Structural Drawings
- Mechanical Drawings
- Electrical Drawings
- Plumbing Drawings
- Kitchen Drawings
- Nurse Call Drawings
- Project Manual - Vol 1
- Project Manual - Vol 2
Check Back Reqularly for Addendums!
- Addendum 1
- Addendum 2
- Addendum 3
- Addendum 4
- Addendum 5
- Addendum 6
- Addendum 6a
- Revised Architectural Page A1.00
- Revised Architectural Page A2.40
- Revised Architectural Page A4.10
- Revised Architectural Page A4.11
- Revised Architectural Page A8.20
- Revised Spec 035413 - Gypsum Cement
- Revised Spec 072750 - Weather Resistant Barrier and Flashings
- Revised Spec 074646 - Fiber-Cement Siding
- Revised Spec 075400 - Thermoplastic Polyolefin (TPO) Roofing
- Revised Spec 087153A - Door Hardware Schedule
- Revised Spec 113100 - Residential Appliances
- Addendum 7
- MEP Narrative Addendum 7
- Revised Interior Drawings
- Revised Structural Drawings
- Revised Mechanical Drawings
- Revised Electrical Drawings
- Revised Plumbing Drawings
- Revised Nurse Call Drawings
- Revised Specifications
- Revised Spec 007343A
- Revised Spec 260520
- Revised Spec 263200
- Addendum 8
- Addendum 9
Bids Due:
Project Documents:
- Pavilion Construction Request for Subcontractor and Supplier Bids
- *Revised Davis Bacon Wage Decision Residential*
- On/Off Site Work, Concrete, Exterior Elevations, Second/Third Floor Construction
- *Revised Davis Bacon Wage Decision Commercial*
- Proposed Limits of Commercial Wage Scale
- Geotechnical Report
Documents: *HUD Drawings*
- Civil Drawings
- On Site Civil Drawings
- Off Site Civil Drawings
- Traffic Signal Drawings
- Landscape Drawings
- Architectural Drawings
- Interior Design Drawings
- Fire Sprinkler Drawings
- Structural Drawings
- Mechanical Drawings
- Electrical Drawings
- Plumbing Drawings
- Kitchen Drawings
- Nurse Call Drawings
- Project Manual - Vol 1
- Project Manual - Vol 2
Check Back Reqularly for Addendums!
- Addendum 1
- Addendum 2
- Addendum 3
- Addendum 4
- Addendum 5
- Addendum 6
- Addendum 6a
- Revised Architectural Page A1.00
- Revised Architectural Page A2.40
- Revised Architectural Page A4.10
- Revised Architectural Page A4.11
- Revised Architectural Page A8.20
- Revised Spec 035413 - Gypsum Cement
- Revised Spec 072750 - Weather Resistant Barrier and Flashings
- Revised Spec 074646 - Fiber-Cement Siding
- Revised Spec 075400 - Thermoplastic Polyolefin (TPO) Roofing
- Revised Spec 087153A - Door Hardware Schedule
- Revised Spec 113100 - Residential Appliances
- Addendum 7
- MEP Narrative Addendum 7
- Revised Interior Drawings
- Revised Structural Drawings
- Revised Mechanical Drawings
- Revised Electrical Drawings
- Revised Plumbing Drawings
- Revised Nurse Call Drawings
- Revised Specifications
- Revised Spec 007343A
- Revised Spec 260520
- Revised Spec 263200
- Addendum 8
- Addendum 9